List of projects in Teiko
This is a list of projects in Teiko. This list is limited only to projects based on their large investment commitment, vast complexity (especially in organizational terms), and long-lasting impact on the economy, the environment, and society". The number of such projects is so large that the list may never be fully completed.
Definitions[edit | edit source]
Projects listed here may be defined as:
- Projects that cost more than US$1 billion and attract a lot of public attention because of substantial impacts on communities, environment, and budgets
- Projects can also be "initiatives that are physical, very expensive, and public".
Current list[edit | edit source]
Project | City/Prefecture | Status | Cost | Special Notes |
---|---|---|---|---|
Mizutani Green City | Mizutani, Kamizaki | Under Construction | US$60,000,000,000 | The proposed Mizutani Green City is a master-planned property will be the Teiko’s most modern and the first technologically-integrated city with a mix of residential, commercial, agro-industrial, institutional and information technology developments. |
Teiko Maglev High-Speed Rail | Teiko | Under Construction | US$45,000,000,000 | The proposed Teiko Maglev High-Speed Rail will be the longest maglev line in the country connecting Kaijo, Rakuzan and Akamayu. The proposed new line will cut travel time from Kaijo to Rakuzan to 15-20 minutes. |
Kaijo International Airport | Echizen, Kaijo | Under Construction | US$30,000,000,000 | The proposed Kaijo International Airport will replace the existing Shouzo Nijimura International Airport as the main gateway to Teiko. It will have three runways and four terminal buildings. The airport will be built in Nokonoshima Island in Echizen, Kaijo. |
Teiko Shinkansen | Teiko | Completed | US$15,000,000,000 | Teiko Shinkansen colloqually called as the Teiko Bullet Train is a network of high-speed rail that connects the cities of Kaijo, Rakuzan, Tetsuya, Dojimazaki, Aokuro and Akamayu. The first section of the Teiko Shinkansen connecting Kaijo and Rakuzan is the world's busiest high-speed rail line carrying 250 million passengers in 2016. |
Hayama Global Village | Hakata, Kaijo | Under Construction | US$10,000,000,000 | Hayama Global Village is an underconstruction smart city or "ubiquitous city" that is being built from scratch on 600 hectares (1,500 acres) of reclaimed land along Hakata waterfront. |
Rakuzan-Kaijo Expressway | Rakuzan & Kaijo | Completed | US$8,500,000,000 | The Rakuzan-Kaijo Expressway is the first limited access road in the country and is the busiest when ranked in numbers of vehicles handled. |
Miyazaki Nuclear Power Plant | Miyazaki, Rui | Under Construction | US$6,500,000,000 | The Miyazaki Nuclear Power Plant is a large power plant in Miyazaki. The facility has six pressurized water reactors (PWRs) with a total installed capacity of 5,881 MW. It is at 70% completion with Monera Heavy Industries S.A leading the construction. |
Beika Industrial Park | Nishi, Beika | Completed | US$5,000,000,000 | The Beika Industrial Park is master-planned industrial zone in Beika. It was completed in June 2017. Currently, more than 10 major companies are operating factories or faciltieies in the industrial zone. |
Towada-Rakuzan Bridge | Towada & Rakuzan | Completed | US$3,500,000,000 | The Towada-Rakuzan Bridge is the longest suspension bridge in Teiko and is the second longest suspension bridge in the world after the Akashi-Kaikyo Bridge. |
Akashi Corporate Center | Shirofuku, Kaijo | Completed | US$1,000,000,000 | Akashi Corporate Center is the new headquarters of the Akashi Corporation. At 600 meters, it is the tallest building in AIN and in Teiko and is the 4th tallest building in the world. It is the second tallest freestanding structure in Teiko after the Kaijo SkyTree. |